P&D TAMPA | Veterans Memorial Park – Phase 3 Memorials
The Hillsborough County Veterans Park and Museum, located on US 301 at the Tampa Bypass Canal in Hillsborough County, was established to honor the residents of Hillsborough County who served, and especially those who lost their lives in war. The World War II, Afghanistan War, Seminole War, Spanish American War, and Civil War veterans’ memorials were recently completed in 2017, resulting in a total of 16 separate memorials located throughout the park. This current phase of memorial development is expected to bring multiple privately funded public dedication ceremonies organized by numerous veteran, community, and family groups that will further public awareness of the park and aid in establishing this park and museum as a destination in the region. Supporting this goal, Genesis contributed civil engineering and landscape architecture services at a reduced cost.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Kyle Thornton, P.E.
Project Manager responsible for client coordination, and overseeing all site design and permitting.
Jose Maldonado, CGC
Responsible for construction inspection.
Jonathon Thornton, E.I.
Project Engineer responsible for plan production and permitting.
CEI NORTHWEST FLORIDA | SR 30 (US 98) – Emerald Bay Drive to Tang-O-Mar Drive
Genesis CEI is the prime consultant on the US 98 (SR 30) project from Emerald Bay Drive to Tang-O-Mar Drive in Walton County, with a small section in Okaloosa County. This is a $42-million project to reconstruct 3.37 miles of US 98. The project started in November of 2016 and is expected to be completed in early 2020. The improvements under this contract consist of the widening and reconstruction of US 98 from the existing 4-lane rural roadway to a 6-lane urban roadway, which includes a raised median section with numerous directional openings for control of driveway access, 4-foot bike lanes, and 8-foot sidewalks on each side of the roadway. Included within the project limits are six signalized intersections that require complete reconstruction of all signalization equipment with new mast arms. All drainage for the project is through a new closed drainage system that collects runoff and discharges it into four new retention ponds.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Elizabeth Graham, E.I., Roadway Senior Inspector
As Senior Inspector, Elizabeth leads the field staff to ensure the contractor is complying with FDOT standards and contract plans.
Sonny Edmonson, Asphalt Plant Inspector
As Asphalt Plant Inspector, Sonny performs verification testing at the contractor’s asphalt plant to ensure a quality product.
Nicolas Parker, Roadway Inspector
As Roadway Inspector, Nick inspects and reports the contractor’s day to day operations and performs materials sampling.
P&D TALLAHASSEE | Okaloosa County Public Beach Access
Genesis provided site planning and civil engineering services for three Beach Access Sites for the Okaloosa County Tourist Development Department. The three nearly identical sites are located on the south side of Santa Rosa Boulevard on Okaloosa Island, adjacent to the Gulf of Mexico. The 1.4-acre sites are within the County owned and maintained right-of-way. Currently, the sites are informally used for beach parking and access. At the completion of construction, each site will provide a public restroom, pavilion, parking improvements, landscape enhancements, and pedestrian connectivity to the existing dune crossover boardwalk system. Construction is expected to be complete by March 2018.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Joseph Petrich, PLA
Project Manager responsible for overseeing all site design, landscape design, plans production, and client relations.
Echo Gates, P.E.
Senior Project Engineer responsible for stormwater design and permitting.
Melissa Pennington, E.I.
Project Engineer responsible for plans production.
CEI SOUTHWEST FLORIDA | Gateway Expressway

Genesis CEI is a major subconsultant on the 1,300-day Gateway Expressway design-build project in Pinellas County. It will take more than $544-million to construct over 12 miles of bridges, flyovers, and roadways. This project is complex and incorporates several components and upgrades to the existing roadway system, including:

  • SR 690 will be a new elevated 4-lane expressway connection from US 19 to west of I-275.
  • SR 686A will be a new elevated 4-lane elevated expressway from the Bayside Bridge to just west of I-275 that will merge with SR 690 via flyover structures.
  • SR 686 (Roosevelt Boulevard) will be reconstructed from the Bayside Bridge to SR 688 (Ulmerton Road) as a 2-lane road with new access to the St. Pete-Clearwater International Airport.
  • CR 296 (118th Avenue) will reconstructed from US 19 to 31st Court North. I-275 will be reconstructed from South of Gandy Boulevard to North of 4th Street North.

All elevated roadways will be managed toll lanes. The Gateway Expressway project is the largest project ever undertaken by FDOT District 7. When completed, this project will result in a significant positive impact to the region.
Read More

SPOTLIGHT STAFF ON THIS PROJECT
Marty Sanchez, Senior Project Engineer
Marty was actively involved with the development of the Request for Proposal and design-build procurement process and will continue to see the project through to completion.
Rob Walker, Project Administrator
Rob will lead the CEI field and office staff, ensuring the contractor is being held to FDOT standards and contract requirements.
Cindy Jeffers, Contract Support Specialist
Cindy will ensure accurate monthly progress payments as well as the final payment and preparing all contract changes.
P&D JACKSONVILLE | Palisades at Durbin Crossing
Genesis prepared community entry signage and architectural theming for the Palisades at Durbin Crossing, a DR Horton Townhouse Community. Genesis developed initial conceptual plans and detail hardscape plans, and assisted Lowe Engineering with the completion of structural engineering.
SPOTLIGHT STAFF ON THIS PROJECT
Joseph Loretta, PLA
Project Manager / Conceptual Design Development
Joseph Petrich, PLA
Detail Hardscape Design / Conceptual Design Development