P&D TAMPA | 2nd Avenue Mini Storage, St. Petersburg
Genesis recently provided design services for the redevelopment of the existing Goodall Brothers Warehouse Property into a 92,000 SF, 4-story, self-storage facility with a drive through breezeway. The services included professional site design and site permitting to assist in the construction of a 600-unit facility located on approximately 1.25 acres northeast of 16th Street and Burlington Avenue in St. Petersburg, Florida.
Read more about this project >
SPOTLIGHT STAFF ON THIS PROJECT
Isabelle Albert
Responsible for Re-Development Zoning Approval.
Jonathan Thornton, E.I.
Responsible for full Site Design and Permitting.
Michael Sanders, Jr., P.E.
Engineer-of-Record (EOR).
CEI NORTHWEST FLORIDA | SR 83 (US 331) over Choctawhatchee Bay
Genesis CEI had a major role in the team for this $118 million bridge replacement design/build project scheduled to be completed one month early. The successful completion of this 3.4-mile, approximately 1,300-day project was celebrated by the Ribbon Cutting Ceremony held on April 7th at Thomas Pilcher Park, which is the new recreational area beneath the south approach of the bridge.
SPOTLIGHT STAFF ON THIS PROJECT
Trae Hurst, CEI Inspector
Inspects, reports, and ensures construction methods are compliant with standards and specifications.
Pete Leber, CEI Asphalt Plant Inspector
Performs verification testing at the contractor’s asphalt plant to ensure a quality product.
Robbin Moody, CEI Resident Compliance Specialist
Ensures contract compliance for EEO, AA, DBE, and OJT policies.
P&D TALLAHASSEE | Woodside Heights Wastewater Retrofit
Genesis is working with Leon County on a grant-funded project to provide a central sewer system to the Woodside Heights neighborhood. Located in southern Leon County, the project is the initial phase of a state and local effort to reduce the number of septic systems within the Wakulla Springs Basin. Through signage in the neighborhood and direct mailing to residents, Genesis has worked diligently with the County to entice residents to accept this service. To date, approximately 80% of properties have agreed to service. In addition to the central sewer system, Genesis is designing service plans for each individual property and meeting with owners. Septic tanks will be properly abandoned and City water service will be provided to those properties currently on wells.
Read more about this project >
SPOTLIGHT STAFF ON THIS PROJECT
David Hutcheson, P.E., P.S.M.
Project Manager responsible for overseeing all sewer design and plans production.
Carolyn Bibler, E.I.
Senior Project Engineer responsible for coordination with Leon County, City of Tallahassee Utilities, and interaction with homeowners regarding work on their private properties.
Amanda Dean, E.I.
Project Engineer responsible for sewer design and plans production.
CEI SOUTHWEST FLORIDA | I-75 from SR 54 to SR 52
Genesis CEI has a major role on this $72 million, approximately 1,300-day design/build widening project scheduled to be completed this summer. The project includes the design and widening of I-75 from 4 lanes to 6 lanes from SR 54 to SR 52, and a complete redesign of the intersection of I-75 and SR 52. During construction, old railroad bridges were demolished, two new bridges were built over SR 52, and two new bridges were also built over Ossie Murphy Road. Additional project features include MSE wall, sound walls, box culverts, signalization, ITS, and landscaping.
SPOTLIGHT STAFF ON THIS PROJECT
Artie Maus, Contract Support Specialist
Processes monthly progress payments, contract changes, and tracks materials.
Roman Ruth, Senior Roadway Inspector
Manages inspection staff along with inspecting and reporting the contractor’s operations.
P&D JACKSONVILLE | OceanGate Affordable Housing Community
Genesis worked with Beaches Habitat for Humanity to build an affordable, unique, traditional neighborhood residential development with 70 total townhouse units at 201 Mayport Road in Atlantic Beach, Florida. The site work is complete and the development is approximately 65% built out for the OceanGate project. Genesis provided the site plan, permitting, engineering site design, landscape design, hardscape design, site amenity design, and construction documents and coordination for the development.
Read more about this project >
SPOTLIGHT STAFF ON THIS PROJECT
Joseph Loretta, PLA
Project Manager, Site Planner, PUD Applicant, Landscape Architect, Entry Feature and Mail Kiosk Hardscape design, local construction observation.
David Fleeman, P.E.
Engineer-of-Record (EOR).
Jose Maldonado, CGC
Construction Observation Lead.